Demo // sample data

Peak reduction planner

Demand growth / yr2%
Hold for3 yrs

Candidate homes (10)

Target reached
17.9 / 15

Homes

8

Upgrade cost

$64,300

Target in 3 yrs

15.9

Holds?

Yes

HomePeak cutCost
9 Oak StInsulation + weatherization1.9$5,000
15 Birch LnInsulation + weatherization1.5$4,800
41 Elm CtInsulation + weatherization2.1$7,000
3 Birch LnInsulation + weatherization3.2$11,000
18 Maple AveInsulation + weatherization2.4$8,500
12 Maple AveInsulation + weatherization1.6$6,000
22 Oak StInsulation + weatherization1.3$5,500
30 Elm CtHeat pump3.9$16,500

Network view

Homes & supply paths

8 of 8 homes shown
Gas pathwayPlanned heat pump pathway
9 Oak St· Insulation + weatherization · identified · 1.9 therms/day planned

Schematic only: houses are arranged for comparison, not at their real locations. Supply nodes and connections are illustrative, not utility asset records. Upgrade paths reflect program status, not live power flow. Showing the first 24 homes.

Illustrative sample homes and figures. The 3D view is a schematic, not real locations or connections.